Please see this post for more details on the project. An early render of the installation, when still at the planning stage.
We started to build the installation in West London at Shape Construction‘s space.
Experiments with coating attachment techniques. We ended up using a material reclaimed from car tyres.
Joe, who helped us on the project, testing out the face tracking software.
Pete experimenting with the face tracking, and his laser eyes.
Joe organising mirror pieces at Selfridge’s before moving them into the window area proper.
Rigging and planing in the window itself.
Final squeeze.
At 0900 in the morning, after a very very long night.
Your email is never published nor shared. Required fields are marked *
You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>
Notify me of follow-up comments by email.
Notify me of new posts by email.
Making Future Artefact
Please see this post for more details on the project. An early render of the installation, when still at the planning stage.
We started to build the installation in West London at Shape Construction‘s space.
Experiments with coating attachment techniques. We ended up using a material reclaimed from car tyres.
Joe, who helped us on the project, testing out the face tracking software.
Pete experimenting with the face tracking, and his laser eyes.
Joe organising mirror pieces at Selfridge’s before moving them into the window area proper.
Rigging and planing in the window itself.
Final squeeze.
At 0900 in the morning, after a very very long night.
Share this: